Cost Guidelines Table Name | Tab Number |
---|---|
Personnel Labor Rates | Tab 1 |
Lab Analysis | Tab 2 |
On-Site Laboratories | Tab 3 |
Lab Analysis (Air) | Tab 4 |
Supplies | Tab 5 |
Small Items | Tab 6 |
Equipment (Small) | Tab 7 |
Equipment (Heavy) | Tab 8 |
Equipment (Drilling) | Tab 9 |
Drilling | Tab 10 |
Miscellanous Drilling Costs | Tab 11 |
Direct Push Tech | Tab 12 |
Preliminary Site Assessment Phase Work Plan | Tab 13 |
Soil And Water Investigation Work Plan | Tab 14 |
Interim Remedial Action Work Plan | Tab 15 |
Community Health and Safety Plan | Tab 16 |
Cone Penetrometer Test: Installation of 8 CPT probes to 30 ft | Tab 17 |
Hand Augering: Installation of 5 hand augers borings to 10 ft | Tab 18 |
Soil Boring Installation: Installation of 3 borings to 30 ft | Tab 19 |
Soil Boring Installation: Installation of 6 borings to 50ft | Tab 20 |
Trench/Test Pit Excavation: Excavation of 30 ft of trench to 15 ft. | Tab 21 |
Hydropunchu00ae1:Installation of 6 sample probes to 30 ft to sample groundwater | Tab 22 |
Groundwater Well Installation: Installation of 3 borings to 30 ft; converted to 2 inch monitoring wells. | Tab 23 |
Groundwater Well Installation: Installation of six (6) borings to fifty (50) feet; converted to two inch monitoring wells. | Tab 24 |
Well Development | Tab 25 |
Vapor Test (8 hour) | Tab 26 |
Pump Test (48 hour) | Tab 27 |
Free Product Removal: up to six (6) wells | Tab 28 |
Groundwater Monitoring Event: three (3) wells at thirty (30) feet. | Tab 29 |
Groundwater Monitoring Event: six (6) wells at fifty (50) feet. | Tab 30 |
Periodic Groundwater Monitoring Report: Three (3) wells; no other activity conducted. | Tab 31 |
Periodic Groundwater Monitoring Report: Six (6) wells; no other activity conducted. | Tab 32 |
A)Periodic Update Report: Significant activities conducted. B)Periodic Update Report: No activities conducted during reporting period. | Tab 33 |
Site Assessment Report: six(6) borings to thirty (30) feet; three (3) converted to monitoring wells | Tab 34 |
A)Corrective Action Plan Preparation: Basic site with moderate groundwater and soil contamination. B)Corrective Action Plan Preparation: Complicated site with extensive groundwater and soil contamination; difficult hydrogeology and multiple contaminants | Tab 35 |
A)Remedial Action Plan Preparation: Basic site with moderate groundwater and soil contamination. B)Remedial Action Plan Preparation: Complicated site with extensive groundwater and soil contamination; difficult hydrogeology and multiple contaminants. | Tab 36 |
A) Excavate and segregate overburden and contaminated soil B) Consulting Excavation | Tab 37 |
A) System Operations and Maintenance B) Operations and Maintenance Supplies | Tab 38 |
A) Contaminated Soil B) Contaminated Liquid C) Containerized Waste | Tab 39 |
A) Off-site Remediation B) Off-site Disposal | Tab 40 |
Clean up Progress Report | Tab 41 |
A) Site Survey B) Underground Utility Check C)Traffic Control | Tab 42 |
Total Subcontract or Equipment Mark-Up Amount | Tab 43 |
After Tank Removal; Overexcavate and Dispose of 150 Yd3 of Petroleum Contaminated Soil | Tab 44 |